PRT-BD · EXISTING CONCRETE BRIDGE DECK
PRT™ BRIDGE DECK SYSTEM
Bonds at 20+ YRS pull-off, cures to traffic in 4 hours at 70°F, delivers 20-year service life over concrete bridge decks.
The stack
FIVE LAYERS.
ONE WARRANTY.
Read top-down. Each layer is engineered to bond to the one above and below. Skip a layer and you skip the warranty.
05
RhinoLock
RHINOLOCK™ BD
Breathable, penetrating sealer coat
04
RhinoTex
RHINOTEX™ BD
High-strength wearing surface
03
RhinoHide
RHINOHIDE™ BD
Polymer overlay, ½″ lift
02
RhinoPatch
RHINOPATCH™ BD
Crack-bridging repair mortar
01
Substrate
BRIDGE DECK SUBSTRATE
Existing concrete deck
Applications
WHERE IT GOES.
- Highway bridge decks
- Pedestrian bridges
- Movable bridge decks
- Approach slabs
Performance
WHAT IT DELIVERS.
3-5HRS
Return to traffic
15+YRS
Service life
350+psi
Pull-off bond
ASTM C1583
6,400PSI
Compressive @ 24hr
ASTM C39
Documents
SPEC THE PRT-BD SYSTEM.
system sheet · 8 pp · Rev. 2025-09
PRT-BD · BRIDGE DECK SYSTEM SHEET
Five-layer overlay system for concrete bridge decks. 350+ psi, 4 hr cure.
submittal · 32 pp · Rev. 2025-09
PRT-BD · SUBMITTAL PACKAGE
DOT-grade submittal package for concrete bridge deck overlay projects.
Ready to spec
